• We've completed testing of iOS 14. Logbook Pro has no issues observed. APDL's only issue is the Weather Map is crashing. We are working on an update for the crash at this time.

2 Duty periods on the same day

Bill_USA

New member
Joined
Feb 25, 2006
Messages
2
Location
NY
I have a question regarding how to handle 2 duty periods on the same day. When I import, it puts the second leg of day 2 onto day 3 and as a result, the trip is off by a day. Here is the trip as copied from my bid packet

D4164 ONLY ON SUN BSE REPT: 0600L OPERATES- FEB. 12-FEB. 26 Mo Tu We Th Fr Sa Su
Base/Equipment: DTW/319 CA01FO01 -- -- -- -- -- --
-- -- -- -- -- -- 12
SU 723 DTW-LGA 0700 0845 145 55 319 -- -- -- -- -- -- 19
SU 723 LGA-NAS 0940 1245 305 100 319 -- -- -- -- -- -- 26
SU 734 NAS-LGA 1345 1642 257 319 747 0 747 0 1112 LGA 1243 -- -- --
D-END: 1712L (NR 1000) REPT: 0555L Ramada Plaza Hotel (718) 651-2100 LIMO 015
MO * 705 LGA-FLL 0640 0935 255 321 255 0 255 0 410 FLL 900
D-END: 1005L (NR 900) REPT: 1905L Amerisuites 17th St (954) 763-7670 LIMO 020
MO * 626 FLL-MCO 1950 2050 100 319 100 0 100 0 215 MCO 2017
D-END: 2120L (NR 900) REPT: 1737L Florida Mall Hotel (407) 816-5066 WINCOUR 407
TU * 592 MCO-DTW 1822 2106 244 321 244 0 244 2 359
D-END: 2136L --------------------------------------
TOTALS BLOCK 1426 DHD 0 TRIP RIG 134 CREDIT 1600 T.A.F.B. 6336

Thanks.

Bill​
 

Josh

Software Developer
Staff member
Joined
Jun 3, 2005
Messages
96
Location
Florida
Remove this line:
D-END: 1005L (NR 900) REPT: 1905L Amerisuites 17th St (954) 763-7670 LIMO 020


Then it won't put a new day. The program is set up to only have a hotel for a night so it confuses it when there is a hotel for the day.
 
Top