ibrubeer
Well-known member
- Joined
- Aug 31, 2009
- Messages
- 249
I have a trip scheduled that was pulled for sick pay. Is it expected that the forecast line in the Productivity Forecast would include the sick trip? I would think that the block for that trip would not be "forecast" any more as soon as it is tagged sick instead of block.
Also, I was getting an alert for Feb 25 for a 100/672 block time getting close. I am still getting that alert. Obviously, with this trip getting pulled, there should be no problem for block limits (over 21 block hours). Why am I still getting a limit alert? It seems like available block did not increase by the amount of block in the sick trip either.
At what point does a user get a block limit alert? Within how many hours?
I have screenshots if that would be helpful too.
Also, I was getting an alert for Feb 25 for a 100/672 block time getting close. I am still getting that alert. Obviously, with this trip getting pulled, there should be no problem for block limits (over 21 block hours). Why am I still getting a limit alert? It seems like available block did not increase by the amount of block in the sick trip either.
At what point does a user get a block limit alert? Within how many hours?
I have screenshots if that would be helpful too.