Hi Neil,
Just curious if there is a way to use the schedule importer with paste/process (Southwest pilot so no schedule sync available) and have it attach the trip to a Reserve period?
I have tried adding a reserve period to the calendar and then importing the trip but it just wants to replace the reserve with the trip.
I have also tried editing the duty times on the imported trip but there doesn’t seem to be a way to add a reserve duty time before the trip starts.
For right now I have been adding the reserve period to the calendar and then having to manually add each leg to the trip. Wish there was a easier way to get both reserve duty times and trip details with the schedule importer
Just curious if there is a way to use the schedule importer with paste/process (Southwest pilot so no schedule sync available) and have it attach the trip to a Reserve period?
I have tried adding a reserve period to the calendar and then importing the trip but it just wants to replace the reserve with the trip.
I have also tried editing the duty times on the imported trip but there doesn’t seem to be a way to add a reserve duty time before the trip starts.
For right now I have been adding the reserve period to the calendar and then having to manually add each leg to the trip. Wish there was a easier way to get both reserve duty times and trip details with the schedule importer