Logged Schedule import problem

pcohen

Well-known member
Joined
Feb 4, 2007
Messages
284
I am using “Check schedule.”

For some reason it dropped my 1 day LGA-IAH turn on the 30th and put those legs on the 26th, which was a 3 day training event. Instead of the LGA-IND dead head, it has the LGA-IAH on that day with the hotel, but not the second and third day of training. I don’t mind if training doesn’t import, I’m used to manually adding it, but why would it erase a trip that was previously imported and is still on my schedule with no changes? What is worse is it seems to have merged part of the trip from the 30th with the training on the 26th.

a60314d4c7bb9c95deff8172b6c3c284.jpg
250237c46670e002fb469501c0c5dc93.jpg
d6f481badaa96a321027fe59199e3d22.jpg



Sent from my iPhone using Tapatalk
 
Back
Top