Days with Less than Minimum Guarentee

crustemeyer

Well-known member
Joined
Jan 25, 2006
Messages
49
I have vacation for a day in March for which I am getting paid 2.5 hours. Our minimum guarentee is 3.75. I have created my own payroll category called VAC1. In this category, i have told the program to pay me a minimum of 2.5 hours. However, when I look at the payroll summary for this date, it is still paying me 3.75 hours. I have run out of ideas on how to trick the system into ignoring the 3.75 daily guarentee for this one payroll category.

Any suggestions? Thanks.
 

Eric Addis

Senior Support Engineer
Staff member
Joined
Jan 18, 2003
Messages
850
Location
DTW
Please submit this on a support ticket along with what RIGS you are using. Remember if a RIG is greater it will always win in the payroll calculations.
 
Top